操纵山风电场重新供电

我们经营操纵山风电场超过20年, with the site’s 10 turbines generating up to 5 megawatts of renewable power. The site, in its current form, has consent to operate in perpetuity.

而涡轮机目前表现良好, newer more modern technology is available which is more reliable and capable of producing more energy. 我们正在寻求给风电场重新供电, 从而使站点的重用次数更少, 更大的, 更高效的, 容量更大的现代涡轮机. In doing so, the benefits are maximised without the need to develop a new greenfield site.

位置

大约6.位于Co . Limavady东南2公里处. 德里/伦敦德里.

涡轮机数量

The proposal for the site is for the development of 7 turbines. The original application also included for an opportunity to co-locate energy storage as part of the proposal, 然而, 这已被删除.

潜在的能力

同时根据最终选择的涡轮机尺寸, the generating capacity of the repowered 操纵山风电场 will be in the region of 30 MW.

目前的阶段

A planning application for the site was submitted in July 2019 to Causeway Coast and Glens Borough Council.该提案于2022年9月28日在委员会上获得批准, 并于2022年10月5日发布决定通知.

该申请在36个规划条件下获得批准. 这些问题涉及到包括生态学在内的问题, 生境管理和建设或准入安排.

Timescales for the implementation of the proposal will be determined by the timescale for the construction of a grid connection, and Scottish Power Renewables will work with 北爱尔兰 Electrical Networks on the delivery of the infrastructure required.

The determination of the planning application saw extensive analysis of the environmental impact of the development through an 环境声明 (ES). 这, 以及其他支持信息, can be viewed by clicking the link for the NI网站策划 below, 使用视图规划应用程序搜索功能.

Following consultation with the Causeway Coast and Glens Borough Council during the application process, Scottish Power Renewables Ltd omitted the previously included ‘energy storage units’ from the planning application. 这 did not alter the technical assessments presented in the ES.

社区协商

The application process also saw extensive community engagement, including three rounds of Public Information Days (PIDs) held in Garvagh and Limavaddy in 2017 and 2019. Additionally, SPR completed a leaflet drop in the local area and advertised in local newspapers.

好处

作为英国领先的陆上风电开发商, 船东及经营人, at SPR we are keen to integrate ourselves into the communities in which we operate our windfarms.

特别提款权在北爱尔兰有着长期的基础, and currently operate five onshore windfarms in 北爱尔兰, with key interests in Belfast Harbour and with Harland and Wolff which were used to assist in the build out of some of our offshore wind portfolio.

The development of our West of Duddon Sands 离岸 风farm (operational since 2014) enabled the construction of the £50 million facility at Belfast Harbour which began in early 2012, creating the first purpose built offshore wind installation and pre-assembly harbour in the UK and 爱尔兰, 在此过程中支持多达300个工作岗位.

SPR is also progressing East Anglia ONE 离岸 风farm towards construction. Lamprell, 与哈兰德和沃尔夫合作, have been awarded a significant foundation fabrication contract. The value of this contract is circa £30 million with an average labour force of 200 people across the duration of the project with a peak of around 350 jobs.

Our community benefit funds support a wide range of worthwhile local initiatives, and SPR remains committed to working closely with the communities in which we operate, including continuing to maximise opportunities for local businesses.

We are proud to have voluntarily contributed to local communities to date in 北爱尔兰, 其中包括向, 弗马纳信托基金, 以及为当地小学提供资金. These funds have been used to support a wide range of projects in local communities in 北爱尔兰.

We are keen to discuss a community benefit package with the local community, 为满足周边社区的需求而量身定制, and which has the capability to support the areas long term development ambitions.

下面概述了该项目的主要好处.

在铜锣海岸和格伦斯每年创造多达16个就业机会, 73 job years in 北爱尔兰 during construction and decomissioning. 装机容量25-30MW & 低碳发电量约118.每年3GWh. 34,750 tonnes of CO2 avoided annually compared with a fossil fuel-mix of electricity generation . 为一万九千多户家庭提供足够的电力 . 铜锣海岸新增约3个工作岗位 & Glens area during operation, and 4 new jobs created elsewhere in 北爱尔兰 . In addition to landowner rents the development would be liable for non domestic rates, 大约是13英镑.在30年的时间里有100万 . 向当地社区提供一揽子社区福利. 为当地的商品和服务供应商提供机会 .

设计注意事项

The windfarm design has been reached through feedback from consultees and communities, where turbine positions and associated infrastructure have evolved through the design process to achieve a final layout sympathetic to environmental constraints and surrounding landscape.

涡轮机的顶部距离拟议的137米, allow 3 fewer turbines to be used yet will be capable of producing around 7-8 times the output of the existing 10-turbine 操纵山风电场.

联系

项目团队可以通过以下方式直接联系 电子邮件

参考文献

文档

Please click on the links below to view the 操纵山风电场 Repower key project documents.

项目简介单张

操纵山风电场重新供电 - A proposal to Repower the existing 操纵山风电场